Partial Progress?

ITU's Study Group 15, the body associated with transmission and networks, met in Geneva recently. One interesting statistic I heard during that meeting was that Question 13, the synchronization sub-group, receives as many contributions as some entire study groups. Synchronization is far and away the biggest “Question” within ITU.

This meeting we covered 98 individual contributions, and agreed 10 separate output documents. Most of those were amendments or corrections to existing documents, but there was one entirely new recommendation, the long-awaited G.8275.2. This document is the PTP Profile for Networks with Partial Timing Support. What this means is that it defines how to use the PTP profile to deliver time and phase across networks which may be wholly or partially unaware of the PTP protocol itself.

Up to now, the ITU has restricted itself to defining PTP support over networks where every network element (switch, bridge or router) contains a boundary clock. This boundary clock recovers the time and forwards it on to the next element in the chain, reducing the error that is introduced by the network. This model is known as “full timing support”, because every element of the network participates in the protocol to help distribute accurate time.

This new profile may be used across networks which don’t necessarily assist the protocol at every node. This is a big deal – it means that PTP can be used to distribute time across existing networks. So does this mean that PTP time distribution is set for a big expansion in deployment? Well – maybe! The protocol details may have been agreed, but the performance details are still to be finalised. What is clear is that getting time to the microsecond across the general network is a non-starter, even using this new profile. To get the best performance, the network must be carefully planned, and the sections that don’t have any timing support must be minimised and kept as short as possible.

That said, there is a provisional agreement on the overall performance target for the networks. Now the profile has been defined, we can start to get some detailed measurements of real networks and see how these measurements stack up against those targets. Watch this space!

Tim Frost
Strategic Technology Manager, Calnex Solutions.

Recent Blogs

Related Blogs

Four Boardroom Members

How to Optimise Your IT Network and Spend

Feb 06, 2019
Network emulation can be a key tool to overcome barriers in getting the most out of your…
3985 Read more

Responding to IT Network Issues

Jan 22, 2019
If simple remedial scripts are not enough to fix an IT network issue, a more…
4655 Read more

Keeping Audiences 'In the Moment'

Nov 16, 2018
Today’s broadcast audiences are seeking more. They want user defined, on demand content.…
1500 Read more

Archived Blogs

1247 More
1482 More

Timing not Telecoms

Nov 08, 2016
973 More

5G Coming Soon

Aug 22, 2016
997 More

What is 1588 PTP?

Aug 04, 2016
1241 More

5G on the Horizon

Aug 01, 2016
994 More
1011 More

What is a PTP Clock?

Apr 09, 2016
1228 More

What is Time Error?

Oct 21, 2015
1003 More

LTE-A & VoLTE Rollout

Sep 22, 2015
970 More

LTE Picks Up Speed

Aug 22, 2015
941 More

What is the Time?

Aug 22, 2015
970 More

Mobile and Sync

Aug 22, 2015
934 More

What is SyncE?

Aug 22, 2015
1879 More
1058 More

Microwave Update

Aug 22, 2015
1038 More

Unravelling Standards

Aug 22, 2015
1007 More

Interpreting ITU

Aug 22, 2015
939 More

Confusion Rules!

Aug 22, 2015
996 More

Basestations Need Sync

Aug 22, 2015
985 More

ITSF 2015 Edinburgh

Aug 22, 2015
939 More

India to Follow China?

Aug 07, 2015
950 More
HOW CAN CALNEX HELP YOU FURTHER?

Click your area of interest below for more tutorials and real-world case studies.